Willowbrook Shopping Centre – Phase 1 & 2 Phased demolition and Tenant Improvement of an existing shopping centre in Langley. Phase 1 included demolition of the existing...
News
Holy Trinity Catholic High School
Holy Trinity Catholic High SchoolHoly Trinity High School was originally designed by iconic Canadian Architect, Douglas Cardinal and built in the early 1980’s. Originally...
CNRL Albian Sands
CNRL Albian SandsGraham has been performing mechanical maintenance, turnaround, shutdown and sustaining project services for CNRL’s Albian Sands, since 2014. Our scope includes...
Ethylene-1 Maintenance Turnaround
Ethylene-1 Maintenance TurnaroundWithin a 45-day window, Graham executed complete mechanical, fixed plant maintenance, repair, fabrication, installation, scaffolding and...
Kelowna Community Health and Services Centre – Interior Fit-Out
Kelowna Community Health and Services Centre – Interior Fit-OutThe Kelowna Community Health and Services Centre was built to stimulate the revitalization of Kelowna’s downtown...
Waterfront Place Apartments
Waterfront Place ApartmentsWaterfront Place Apartments are part of the vibrant Waterfront Place mixed-use development in Everett. Located within the expansive 65-acre Waterfront...
Yellowhead Power Station
Yellowhead Power StationGraham was contracted to design, fabricate, supply and install two pre-engineered steel buildings totalling 11,000 sq.ft. The scope also included civil,...
Mt Milligan Copper/Gold Project
Mt Milligan Copper/Gold ProjectGraham scope of work included the construction of a 105’ high Primary Crusher structure used to process the ore material, construction of the ore...
Frank Wastewater Treatment Plant Upgrades
Frank Wastewater Treatment Plant UpgradesThe project consists of the construction of a second process stream for incoming wastewater, a major headworks building addition and a...