Bearspaw Water Treatment Plant – Stage 1 Filter Pipe Gallery Upgrades

Location: Calgary, AB

The Bearspaw Water Treatment Plant (WTP) was constructed in 1972 and is one of the two plants that provides the residents of Calgary with clean drinking water.

The Stage 1 – Filter Pipe Gallery Upgrades project was constructed within the current Bearspaw Water Treatment Facility and included major upgrades to the Stage 1 Filters as well as replacement of both stage 1 & 2 Filter distributed control systems. As General Contractor, Graham was responsible for new piping, process valves/actuators, instrumentation, access grating/platforms, water quality monitoring stations, lighting, loading dock, and HVAC System.

Contract Value

$10M CAD

Prime Consultant

Associated Engineering

Project Owner

City of Calgary

Contract Format

Stipulated Price

Completion Date

Spring 2022

Contract Duration

22 Months