Lumsden Wastewater Treatment Plant Upgrades
Location: Lumsden, SK
The project consisted of one new main lift station and associated gravity sewer and force main extensions with a new treatment facility. The new facility not only increased the sewage treatment capacity, but also addressed environmental impact, air quality and greenhouse gas emissions.
The head work building was coupled to the new treatment building by installing 200 meters of new 250mm diameter force main. The headworks building work included 6 mm spiral screen, Vortex grit removal c/w grit dewatering with associated mechanical and electrical systems. The treatment building included work not limited to; two-train Sequencing Batch Reactors complete with decanter boxes and utility water pumps, ultraviolet disinfection system, sludge holding tank and associated mixing system, aerobic/anoxic sludge digester and associated mixing system, thickener and associated feed system, centrifuge and associated feed system, chemical feed systems, effluent outfall piping, odour control equipment and site works including access road and water main extension, decommissioned existing lift station and build new lift station on the same site.
Contract Value
$21.1M
Prime Consultant
Stantec Consulting Ltd.
Project Owner
Town of Lumsden
Contract Format
Stipulated Price
Completion Date
May 2021
Contract Duration
25 months