Husky Ethanol Project
Location: Lloydminster, SK
Husky contracted Graham to provide engineering, procurement, construction and commissioning services for a new ethanol plant with capacity of 130 million litres per year.
The basic components of the project include: a grain handling facility and associated material handling systems; a grain milling facility, a fermenter (field-erected tanks), process equipment, distillation and dehydration process systems, an evaporator, centrifuges and dryers for DDGS co-product, a cooling tower, ethanol storage tanks complete with truck and rail load-out systems, and DDGS storage. Engineering included detailed civil, structural, mechanical, electrical and instrumentation design based on a process design provided by the owner.
All work was done adjacent to an existing oil upgrading plant and co-generation plant with numerous tie-ins to existing services.
Contract Value
Undisclosed
Prime Consultant
KGS Group
Project Owner
Husky Oil Operations
Contract Format
Engineering, Procurement, Construction, Commissioning (EPCC)
Completion Date
Aug 2006
Contract Duration
22 months