Boeing 737 MAX Project, Murray Park Facility

Location: Winnipeg, MB

This project involved construction of a 14,437 m2 addition to Boeing’s existing aircraft composite parts manufacturing facility. The expansion includes a clean room (to identify airborne contaminants per volume), and infrastructure support for two additional 16 foot x 45 foot autoclaves. The expanded building, which includes two bays about the size of 12 Olympic-sized swimming pools, allows Boeing to build the complex parts for its newest 737 model in-house.

Graham’s expertise with projects of this level of complexity allowed for multiple value engineering and design innovations. The success of this complex project required Graham to be adaptive and flexible, accommodating the client’s evolving needs.

Contract Value

$42M CAD

Prime Consultant

Stantec

Project Owner

Boeing Canada Operations Ltd.

Contract Format

CM as Agent

Completion Date

November 2015

Contract Duration

31 months