Bearspaw Water Treatment Plant – Stage 1 Filter Pipe Gallery Upgrades
Location: Calgary, AB
The Bearspaw Water Treatment Plant (WTP) was constructed in 1972 and is one of the two plants that provides the residents of Calgary with clean drinking water.
The Stage 1 – Filter Pipe Gallery Upgrades project was constructed within the current Bearspaw Water Treatment Facility and included major upgrades to the Stage 1 Filters as well as replacement of both stage 1 & 2 Filter distributed control systems. As General Contractor, Graham was responsible for new piping, process valves/actuators, instrumentation, access grating/platforms, water quality monitoring stations, lighting, loading dock, and HVAC System.
Contract Value
$10M CAD
Prime Consultant
Associated Engineering
Project Owner
City of Calgary
Contract Format
Stipulated Price
Completion Date
Spring 2022
Contract Duration
22 Months